content: Fix imported posts (markdown syntax, article types)
The auto-importer has created several issues with the markdown syntax which needed manual fixing. Additionally quite a lot of event annoucements were categorized as article.
This commit is contained in:
		
					parent
					
						
							
								d2fc9294a2
							
						
					
				
			
			
				commit
				
					
						3957b4e129
					
				
			
		
					 181 changed files with 424 additions and 605 deletions
				
			
		|  | @ -1,19 +1,19 @@ | |||
| --- | ||||
| authors: | ||||
| - jen | ||||
| categories: event | ||||
| categories: article | ||||
| draft: false | ||||
| header: | ||||
|   caption: Sorry this blog entry was migrated, there is no Alt-Text | ||||
|   image: "bauverz\xF6gerung.png" | ||||
|   image: "bauverzögerung.png" | ||||
| lastmod: '2019-04-30T18:42:00+02:00' | ||||
| location: Z9 | ||||
| publishDate: '2019-04-30T18:42:00+02:00' | ||||
| slug: bauverzogerung-index | ||||
| title: "Bauverz\xF6gerung" | ||||
| title: "Bauverzögerung" | ||||
| --- | ||||
| 
 | ||||
| Auf Grund äußerer Umstände verzögert sich der Umbau unserer Räumlichkeiten. Wir peilen als **nächsten Eröffnungstermin den <strike>19.05.2019</strike> <strike>19.06.2019</strike> <strike>15.07.2019</strike> <strike>23.09.2019</strike> 31.10.2019** zeitgleich zum Brexit an. | ||||
| Auf Grund äußerer Umstände verzögert sich der Umbau unserer Räumlichkeiten. Wir peilen als **nächsten Eröffnungstermin den ~~19.05.2019~~ ~~19.06.2019~~ ~~15.07.2019~~ ~~23.09.2019~~ 31.10.2019** zeitgleich zum Brexit an. | ||||
| 
 | ||||
| Wir hoffen Technikbegeisterte ab diesem Termin wieder in unserem aufpolierten Räumlichkeiten willkommen heißen zu können. | ||||
| 
 | ||||
|  |  | |||
		Loading…
	
	Add table
		Add a link
		
	
		Reference in a new issue