Case 2.0: New pictures for packing

This commit is contained in:
jtbx 2025-12-23 19:02:55 +01:00
commit 865ece528c
6 changed files with 11 additions and 7 deletions

Binary file not shown.

After

Width:  |  Height:  |  Size: 1.3 MiB

Binary file not shown.

After

Width:  |  Height:  |  Size: 1.2 MiB

View file

Before

Width:  |  Height:  |  Size: 492 KiB

After

Width:  |  Height:  |  Size: 492 KiB

Before After
Before After

Binary file not shown.

Before

Width:  |  Height:  |  Size: 1.2 MiB

Binary file not shown.

After

Width:  |  Height:  |  Size: 1.4 MiB

View file

@ -15,14 +15,15 @@ Compartments (from left to right):
- **XLR Cables**: Multiple XLR cables and Headphones (in a bag)
- **Video Cables**: Multiple SDI and HDMI cables
![](img/voc-case2_0-case_b-comp.jpeg) <!-- TODO: get a better image -->
![Case x.1 without tripod](img/voc-case2_0-case_a-pre.jpeg)
(Case shown without tripod to show location of the sorting box)
### Fitting the Tripod
!!! info ""
Put all dampers (pan, tilt, counterweight) on zero and loosen the breaks before storing the tripod in the bag.
This way, everything can move to fit snugly.
![](img/voc-case2_0-tripod-comp.jpg){ align="right", width="250" }
![](img/voc-case2_0-case_a-tripod.jpg){ align="right", width="250" }
The carrying bag of the new Sachter Ace M Mk II tripods got bigger than the old generation which means that the space in the case is quite tight.
To make everything fit, place the tripod with the head to the right and carrying handle to the back (so it gets past the wooden compartment board).
@ -31,11 +32,17 @@ Otherwise the case lid may not close without forcing it.
Please also take care of the remote control and place it on top and away from the front edge of the case so that it can't be jammed when closing the lid.
There should be enough space between the legs of the tripod.
![](img/voc-case2_0-case_a-all.jpeg)
### Fitting the Power Cables
It's recommended to put the rubber cable mats in the compartment first, then the long cables and the power strips on top.
## Case x.2
!!! info ""
Place all modules with the bottom to the left.
This way everything is "upright" when the case is loaded on the pallet.
Compartments (from left to right):
- **FOH module** (bottom side to the left)
@ -44,8 +51,5 @@ Compartments (from left to right):
- **Lectern module** (bottom side to the left)
- **Encoder module** (bottom side to the left)
<!-- TODO: get a picture showing the modules inside the case -->
!!! info ""
Place all modules with the bottom to the left.
This way everything is "upright" when the case is loaded on the pallet.
![](img/voc-case2_0-case_b.jpeg)
(Note that all modules have their feet on the left side to up upright when tipped!)